Why underlayment is needed
Three jobs: level micro-bumps to 2 mm per meter, dampen impact noise, and shield the core from rising moisture in the concrete. Laminate on bare concrete squeaks on bumps, echoes loud, and swells at edges from subfloor damp.
Important: underlayment is not a substitute for floor leveling. Bigger than 2 mm per meter needs concrete or self-level — 5 mm underlayment won't erase it, and flooring locks will gap.